  • Apache North Sea Forties Project

    • 5,400m of 14” steel line pipe delivered ahead of schedule
    • Solution featured external three-layer polypropylene coating
    • 20 year design life built into product
    The professionalism and dedication of the Tata Steel team ensured that this project was completed ahead of schedule, within budget and delivered to the exact specification.
    Find out more

    Prosperity in the pipeline for Angola

    • Up to 40 pipes processed each day
    While the Malongo project was challenging in a number of aspects, all those involved pulled together and made the project a success.