Lanswoodpark Business Centre, Colchester
Commercial case study, Trisomet®, Trimapanel®, Colorcoat HPS200 Ultra®, Colorcoat Prisma®
Main Client: Lanswood residential and commercial developments
Operator: SMG Europe
Architects: Populous
Cladding installer: Rayell Construction
Tata Steel Products: Trisomet® roof panels and a combination of Trisomet® and Trimapanel® micro-rib wall panels, manufactured from Colorcoat HPS200 Ultra® and Colorcoat Prisma® pre-finished steel.
Colour: Wall elevations Ephyra with Anthracite soffits; roof Goosewing Grey
Year: Phase 1, 2 and 3 completed mid-2016; Phase 4 completed early-2019 with subsequent phases ongoing.
Located near Colchester in Essex, the Lanswoodpark Business Centre offers commercial property and high-quality office, work and storage space. Work is still progressing on this development as the expansion work continues. With Phases 1, 2 and 3 completed, the latest Phase 4 Aster House has just completed and a further four phases are planned to follow.
The challenge
The build programme required a very high standard of specification and colour match was an important driver in creating a modern look for the external elevations of this project.
The solution
Over 2,000m2 of Tata Steel’s insulated roof and wall panels were used in the construction of Phase 1 and Phase 2 of the development. Around 1,000m2 of Trisomet® 120mm panels in Colorcoat HPS200 Ultra® pre-finished steel in Goosewing Grey were used on the roof and nearly 1,100m2 of Trisomet® 80mm and Trimapanel® micro-rib 90mm panels in Colorcoat Prisma® in Ephyra were used on the wall elevations. The wall elevations were finished off with Anthracite soffits.